harb/planner/prerequisite-tree.md
johba 3176dddebd chore: planner run 2026-03-27
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-27 08:08:55 +00:00

4.8 KiB

Prerequisite Tree

Phase 1 — Quality gate & release pipeline

Objective: E2E quality gate (#1099)

  • Core E2E test suite exists (tests/e2e/, 7 files)
  • Mobile viewport coverage (#1099 — closed, merged PR #1139)
  • Cross-browser matrix (#1099 — closed, merged PR #1139)
  • OptimizerV3 test coverage (#1054 — closed)
  • Floor ratchet attack defeated (#1067, #1082 — closed)
  • int256 overflow patched (#1031 — closed)
  • Overflow guard for slots 1-7 (#997 — closed, merged 29b8f7d) Status: DONE

Objective: Conversion funnel verification (#1100)

  • Landing page exists
  • Staking app exists
  • E2E quality gate passing (#1099 — closed)
  • Funnel test: landing → swap → stake (07-conversion-funnel.spec.ts exists, covers full flow with analytics events)
  • Cross-browser spec glob fix (#1154 — closed) Status: DONE

Objective: Release pipeline

  • CI pipeline (Woodpecker)
  • Docker images (registry.niovi.voyage)
  • E2E quality gate integrated into release (#1099 — closed) Status: DONE

Objective: Analytics (#1101)

  • Self-hosted Umami deployed (Docker service, documented in ENVIRONMENT.md)
  • Landing page instrumented (landing/src/views/HomeView.vue, landing/src/main.ts)
  • Staking app instrumented (web-app/src/composables/useStake.ts, useSwapKrk.ts, useWallet.ts)
  • @harb/analytics package with funnel events (packages/analytics/src/index.ts)
  • E2E quality gate passing (#1099 — closed) Status: DONE

Phase 2 — Coordinated launch

Objective: Pitch deck (#1155)

  • Phase 1 complete (E2E quality gate, conversion funnel, analytics all DONE)
  • Pitch deck created (landing/public/pitch-deck.html — merged via PR #1175, #1155 closed)
  • Brand identity defined (human decision — #1155 comment: "No brand identity/domain yet")
  • Pitch deck reviewed with final branding (awaits brand identity) Status: BLOCKED — awaiting human decision on brand identity

Objective: Domain registration

  • Brand identity defined
  • Domain registered and DNS configured Status: BLOCKED — prerequisite chain (brand identity first)

Objective: Influencer outreach

  • Pitch deck exists (landing/public/pitch-deck.html)
  • Pitch deck reviewed with final branding
  • At least 3 influencers committed Status: BLOCKED — prerequisite chain

Objective: Launch day deployment

  • LiquidityManager contract
  • UUPS upgradeable optimizer
  • Conversion funnel verified (07-conversion-funnel.spec.ts)
  • Domain registered and pointing to infrastructure
  • Pitch deck reviewed
  • Influencers committed
  • Adversarial testing depth for launch confidence (#1178 in progress — 2 real red-team runs, 1 ghost run excluded per #1177; need 3+ real runs) Status: BLOCKED — prerequisite chain

Phase 3 — Operations

Objective: Community channel

  • Launch day scheduled Status: BLOCKED — prerequisite chain

Objective: Optimizer governance

  • Protocol live with real users
  • Evolution pipeline producing validated candidates (requires fitness JSON + holdout validation) Status: BLOCKED — prerequisite chain

Foundation (cross-cutting)

Objective: Contract safety

  • Floor ratchet attack defeated (#1067 — closed)
  • int256 overflow patched (#1031 — closed)
  • Overflow guard for slots 1-7 (#997 — closed, merged 29b8f7d)
  • Catch block clamping fix (#1019 — closed)
  • OptimizerV3 tested (#1054 — closed) Status: DONE

Objective: Evidence pipeline

  • Red-team formula exists
  • Evolution formula exists
  • Red-team produces persistent evidence (evidence/red-team/, 2 real files + 1 ghost)
  • Evolution commits via PR (#1047 — closed)
  • Evolution pipeline produces committed fitness evidence (best.push3 untracked on master, no JSON fitness data — per #1166)
  • Holdout produces data (evidence/holdout/2026-03-22-issue517-adversarial-lp.json)
  • User-test produces data (evidence/user-test/2026-03-25.json + 2026-03-26 post-wallet-fix)
  • Resources/protocol formulas produce data (formulas exist, evidence dirs empty) Status: BLOCKED — 2 prerequisites unresolved

Objective: User funnel fix

  • Wallet connector renders at 1280x720 viewport (#1156 — closed, verified by user-test 2026-03-26: 5/5 personas connect)
  • Desktop connect button visible at standard viewports (#1156 — closed)
  • attemptStake helper navigation fix (#1168 — closed, merged via PR #1171)
  • Post-fix staking verification (0/5 staking success in last user-test; #1180 dispatched to re-verify) Status: BLOCKED — 1 prerequisite unresolved (awaiting #1180 user-test results)

Objective: E2E test hygiene

  • Cross-browser spec glob fix (#1154 — closed)
  • Woodpecker evidence-only PR pipeline (#1153 — closed) Status: DONE