# Planner run — 2026-03-22 10:42 UTC
|
|
|
|
## Predictions triaged
|
|
- #1107: DISMISS — gardener double-crash was transient (self-recovered next run), dark-factory infrastructure concern
|
|
- #1105: WATCH — valid observation that #517, #383, #147 are unlabeled and stale; gardener should handle on next triage pass
|
|
- #1103: DISMISS — supervisor preflight.sh CI DB failure is a dark-factory infrastructure issue, not harb
|
|
|
|
## Prerequisite tree updates
|
|
- Resolved: Red-team produces persistent evidence (evidence/red-team/2026-03-20.json exists)
|
|
- Resolved: Evolution commits via PR (#1047 closed)
|
|
- Discovered: Evolution pipeline needs first actual run (evidence/evolution/ still empty)
|
|
- Discovered: Resources/protocol formulas need first run (#1059 closed but data dirs empty)
|
|
- No tree changes to objectives or phases
|
|
|
|
## Top 3 constraints
|
|
1. int256 overflow (#1031) — blocks 9 objectives via Contract safety → Phase 1 chain — issue already open
|
|
2. Overflow guard for slots 1-7 (#997) — blocks 9 objectives — issue already open
|
|
3. Catch block clamping fix (#1019) — blocks 9 objectives — issue already open
|
|
|
|
## Issues created
|
|
No new issues — all top constraints already have open backlog issues (#1031, #997, #1019, #1067, #1054).
|
|
|
|
## Observations
|
|
- Contract safety remains the singular bottleneck. All 5 prerequisites are open backlog issues with no recent activity. The dev agent needs to pick these up.
|
|
- Evidence pipeline progressing: red-team has first baseline, #1047 fixed. Evolution just needs its first post-fix run.
|
|
- Predictions are mostly dark-factory infrastructure noise — harb-specific predictions should increase once contract safety work resumes.
|
|
- Guard hook prevents closing prediction issues directly; left as prediction/actioned label only.
|
|
|
|
## Deferred (in tree, not filed)
|
|
- Mobile viewport + cross-browser E2E coverage (#1099) — blocked on contract safety
|
|
- Conversion funnel test (#1100) — blocked on E2E quality gate
|
|
- Analytics (#1101) — blocked on E2E quality gate
|
|
- Pitch deck, influencer outreach — blocked on Phase 1 completion
|
|
- Evolution first run, resources/protocol data — not blocking the critical path
|
|
|
|
---
|
|
|
|
# Planner run — 2026-03-22 18:30 UTC
|
|
|
|
## Predictions triaged
|
|
No unreviewed predictions.
|
|
|
|
## Prerequisite tree updates
|
|
- Resolved: Evolution pipeline produces output (evidence/evolution/best.push3 exists, dated Mar 19)
|
|
- Updated: Resources/protocol formulas now exist on disk (run-resources.toml, run-protocol.toml) — #1059 closed — but evidence dirs still empty
|
|
- No new objectives or phases added
|
|
|
|
## Top 3 constraints
|
|
1. int256 overflow (#1031) — blocks 10 objectives via Contract safety → Phase 1 chain — issue already open
|
|
2. Overflow guard for slots 1-7 (#997) — blocks 10 objectives — issue already open
|
|
3. Catch block clamping fix (#1019) — blocks 10 objectives — issue already open
|
|
|
|
## Issues created
|
|
No new issues — all top constraints already have open backlog issues.
|
|
|
|
## Observations
|
|
- Contract safety remains the singular bottleneck for the third consecutive run. All 5 prerequisites (#1031, #997, #1019, #1067, #1054) are open with no recent commit activity. The dev agent is not picking these up — may need escalation or explicit prioritization.
|
|
- #1085 (floor ratchet 2000-trade oscillation run) closed, but parent issues #1067 and #1082 remain open — the run provided data but the attack is not yet defeated.
|
|
- Evidence pipeline improving: evolution now has best.push3 output. Resources/protocol formulas implemented but idle (no action issues dispatched, evidence dirs empty).
|
|
- Vault is empty — no procurement requests pending.
|
|
- Three stale unlabeled issues (#517, #383, #147) noted by prediction #1105 still unlabeled — gardener has not yet triaged them.
|
|
|
|
## Deferred (in tree, not filed)
|
|
- Floor ratchet defeat (#1067) and OptimizerV3 tests (#1054) — also contract safety constraints but ranked 4th/5th
|
|
- Mobile viewport + cross-browser E2E (#1099) — blocked on contract safety
|
|
- Conversion funnel (#1100), Analytics (#1101) — blocked on E2E gate
|
|
- Resources/protocol formula dispatch — idle compute, not on critical path
|
|
- Pitch deck, influencer outreach — blocked on Phase 1 completion
|