Planner Memory
2026-03-20 — First planner run
Milestone state
- Foundation: COMPLETE. Agent loop, supervisor, planner, multi-project all working.
- Adoption: NOT STARTED. No bootstrap command, no docs, landing page exists but lacks content.
- Scale: PARTIALLY started (multi-project works for 3 repos).
Evidence pipeline state
- 6 evidence dimensions defined (red-team, evolution, holdout, user-test, resources, protocol)
- 4 have formulas in harb (red-team, evolution, holdout, user-test) — all recently fixed
- 2 have NO formulas at all (resources, protocol) — filed #1059
- 0/6 dimensions have any data on disk
- #1047 blocks evolution specifically (results not committed via PR)
- Red-team is independent and was dispatched as action #1058
Patterns
- Predictor (goblin) over-signals on evidence gaps — all 5 predictions were about missing evidence data. Expected to normalize once pipelines produce their first runs.
- High blocked:backlog ratio across projects suggests deep dependency chains. Gardener should be monitoring for circular deps.
- The factory is self-hosting successfully — all agents run, CI passes, PRs merge. The gap is external visibility, not internal capability.
Strategic direction
- Adoption is the leverage multiplier: everything in Scale depends on having users first.
- Created #1060 (disinto init), #1061 (docs), #1062 (metrics dashboard) as the Adoption on-ramp.
- #1061 depends on #1060 — quickstart needs the bootstrap flow to reference.
- #1062 (metrics dashboard) is the social proof play — show the factory working rather than just claiming it.
Watch list
- #1020 + #1047: evolution pipeline needs commit-via-PR fix before runs produce persistent evidence
- #1022: holdout/user-test blocked on evolution data existing
- #341: stale issue (extraction already done) — gardener should close or update
- Disk at 79% — evidence formulas will add data; monitor trajectory