Planner run — 2026-03-27 08:06 UTC

Predictions triaged

  • #1177: DISMISS — red-team ghost run concern already actioned by predictor as #1178 (action: run-red-team). Planner agrees 2026-03-26 run should not count toward adversarial testing depth.
  • #1179: PROMOTE_ACTION → #1180 — dispatched run-user-test to verify staking funnel post-#1168 fix. Valid: 0/5 staking success rate, fix never re-verified.

Prerequisite tree updates

  • Resolved: Pitch deck created (landing/public/pitch-deck.html merged via PR #1175, #1155 closed)
  • Resolved: attemptStake helper navigation fix (#1168 — closed, merged PR #1171)
  • Discovered: Post-fix staking verification needed (0/5 staking success in last user-test pre-fix)
  • Updated: Adversarial testing depth — 2 real runs + 1 ghost (2026-03-26 excluded per #1177); #1178 in progress for 3rd real run
  • Updated: Pitch deck objective restructured — deck exists but brand identity + review still pending
  • Updated: Influencer outreach — pitch deck exists prerequisite now resolved

Top 3 constraints

  1. Brand identity (human decision) — blocks pitch deck review → influencer outreach → launch day → community → optimizer governance (5 downstream objectives) — no issue, awaiting human
  2. Post-fix staking verification (#1180, action dispatched) — blocks user funnel confidence, impacts launch readiness
  3. Adversarial testing depth (#1178, in progress) — blocks launch day confidence, 2 real runs need 3+

Stuck issues detected

  • #1178: Session crashed once (first attempt), second attempt appears to have completed but evidence not yet committed to master. Not stuck — in progress.

Issues created

  • #1180: action: run-user-test post-attemptStake-fix verification — from prediction #1179

Priority label changes

  • Added priority: #1178 (adversarial testing depth), #1180 (staking verification)
  • Removed priority: none (no issues had priority — previous priority issues all closed)

Observations

  • Pitch deck milestone reached. PR #1175 merged a pitch-deck.html. The deck exists with current KrAIken branding. However, human flagged "No brand identity/domain yet" on #1155 — the deck will need revision once brand is decided. Progress is real but incomplete.
  • Phase 2 bottleneck remains human-gated. Brand identity is still the root constraint. The pitch deck exists as a draft but cannot be finalized or distributed without brand direction. Every downstream Phase 2/3 objective chains through this decision.
  • Red-team reliability issue. #1178 crashed on first attempt, second attempt appears successful (exit code 0, evidence file read). But evidence not yet on master. The red-team formula has now crashed in 2 of last 3 runs (2026-03-26 ghost + #1178 first attempt). Infrastructure fragility is a pattern.
  • Staking funnel never verified end-to-end. The #1168 fix was merged but never tested. All user-test data predates the fix. #1180 dispatched to close this gap.
  • Evidence pipeline slowly filling. User-test: 2 files. Red-team: 2 real + 1 ghost. Holdout: 1. Evolution/resources/protocol: still dark on master.

Deferred (in tree, not filed)

  • Domain registration — blocked on brand identity (human decision)
  • Evolution fitness evidence (#1166) — not on critical path for launch
  • Resources/protocol formula evidence — not on critical path
  • Community channel, optimizer governance — blocked on launch day scheduling
  • Influencer outreach — blocked on brand identity → pitch deck review chain