harb/planner/prerequisite-tree.md
johba c238bd1f57 chore: seed prerequisite tree + RESOURCES.md
Prerequisite tree seeded from VISION.md milestones with current issue state.
Top 3 constraints: contract safety (#1031/#997/#1067), OptimizerV3 tests (#1054),
evolution commits via PR (#1047).

RESOURCES.md lists evolution box, Codeberg accounts, CI, and RPC access.

Part of disinto #502 (planner v2).
2026-03-22 09:09:58 +01:00

80 lines
2.4 KiB
Markdown

# Prerequisite Tree
<!-- Last updated: 2026-03-22 -->
## Phase 1 — Quality gate & release pipeline
### Objective: E2E quality gate (#1099)
- [x] Core E2E test suite exists (tests/e2e/, 6 files)
- [ ] Mobile viewport coverage (#1099)
- [ ] Cross-browser matrix (#1099)
- [ ] OptimizerV3 test coverage (#1054)
- [ ] Floor ratchet attack defeated (#1067, #1082)
- [ ] int256 overflow patched (#1031)
- [ ] Overflow guard for slots 1-7 (#997)
Status: BLOCKED — 6 prerequisites unresolved
### Objective: Conversion funnel verification (#1100)
- [x] Landing page exists
- [x] Staking app exists
- [ ] E2E quality gate passing (#1099)
- [ ] Funnel test: landing → swap → stake (#1100)
Status: BLOCKED — depends on #1099
### Objective: Release pipeline
- [x] CI pipeline (Woodpecker)
- [x] Docker images (registry.niovi.voyage)
- [ ] E2E quality gate integrated into release (#1099)
Status: BLOCKED — depends on #1099
## Phase 2 — Coordinated launch
### Objective: Pitch deck
- [ ] E2E quality gate passing (Phase 1 complete)
- [ ] Analytics in place (#1101)
Status: BLOCKED — Phase 1 incomplete
### Objective: Influencer outreach
- [ ] Pitch deck exists
- [ ] At least 3 influencers committed
Status: BLOCKED — prerequisite chain
### Objective: Launch day deployment
- [x] LiquidityManager contract
- [x] UUPS upgradeable optimizer
- [ ] Conversion funnel verified (#1100)
- [ ] Pitch deck reviewed
- [ ] Influencers committed
Status: BLOCKED — prerequisite chain
## Phase 3 — Operations
### Objective: Analytics (#1101)
- [ ] Funnel tracking infrastructure (#1101)
- [ ] E2E quality gate passing (#1099)
Status: BLOCKED — depends on #1099
### Objective: Community channel
- [ ] Launch day scheduled
Status: BLOCKED — prerequisite chain
### Objective: Optimizer governance
- [ ] Protocol live with real users
- [ ] Evolution pipeline producing candidates
Status: BLOCKED — prerequisite chain
## Foundation (cross-cutting)
### Objective: Contract safety
- [ ] Floor ratchet attack defeated (#1067, #1082)
- [ ] int256 overflow patched (#1031)
- [ ] Overflow guard for slots 1-7 (#997)
- [ ] Catch block clamping fix (#1019)
- [ ] OptimizerV3 tested (#1054)
Status: BLOCKED — 5 prerequisites unresolved. **CONSTRAINT** — blocks Phase 1.
### Objective: Evidence pipeline
- [x] Red-team formula exists
- [x] Evolution formula exists
- [ ] Red-team produces persistent evidence
- [ ] Evolution commits via PR (#1047)
Status: BLOCKED — 2 prerequisites unresolved