Commit graph

11 commits

Author SHA1 Message Date
johba
a2bbc2adb5 chore: planner run 2026-03-26
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-26 08:06:22 +00:00
johba
3f0c8d5342 chore: planner run — Phase 1 complete, bottleneck shifts to Phase 2 (#1157)
Automated planner run — prerequisite tree update and journal entry.

## Changes
- Phase 1 marked DONE (E2E quality gate, conversion funnel, analytics, release pipeline)
- Bottleneck shifted to Phase 2 launch preparation
- New issues filed: #1155 (pitch deck), #1156 (wallet connector fix)
- Predictions triaged: #1148→#1154, #1149 dismissed, #1150 dismissed, #1141 watching, #1104 dismissed
- Priority labels applied to #1154, #1155, #1156

Reviewed-on: https://codeberg.org/johba/harb/pulls/1157
2026-03-25 09:36:59 +01:00
johba
756426aa88 chore: planner run 2026-03-23 2026-03-23 12:54:01 +00:00
johba
b8f442eeb2 chore: planner run 2026-03-22
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-22 14:26:40 +00:00
johba
cbc41ad57c chore: planner run 2026-03-22
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-22 13:18:41 +00:00
johba
bcfb81eab5 chore: planner run 2026-03-22
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-22 11:04:35 +00:00
johba
02ca80fd5a chore: planner run 2026-03-22 2026-03-22 10:44:42 +00:00
johba
c238bd1f57 chore: seed prerequisite tree + RESOURCES.md
Prerequisite tree seeded from VISION.md milestones with current issue state.
Top 3 constraints: contract safety (#1031/#997/#1067), OptimizerV3 tests (#1054),
evolution commits via PR (#1047).

RESOURCES.md lists evolution box, Codeberg accounts, CI, and RPC access.

Part of disinto #502 (planner v2).
2026-03-22 09:09:58 +01:00
openhands
9327c0b5de fix: use 'disinto init' label for #1060 to match journal source
Review flagged inconsistency: line 8 said 'bootstrap init' while the
journal (2026-03-20.md:13) and Strategic direction (line 26) both use
'disinto init'.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-20 19:17:00 +00:00
johba
98ca99d5eb fix: Adoption milestone state ambiguity in MEMORY.md (#1068) 2026-03-20 19:07:02 +00:00
johba
810f47cdd6 chore: planner run journal 2026-03-20 (#1064)
Planner journal entry from first cron-driven run.

Moved from disinto PR #390 — planner journals belong in the harb repo.

Reviewed-on: https://codeberg.org/johba/harb/pulls/1064
Reviewed-by: Disinto_bot <disinto_bot@noreply.codeberg.org>
2026-03-20 16:25:57 +01:00