chore: planner run — Phase 1 complete, bottleneck shifts to Phase 2 (#1157)
Automated planner run — prerequisite tree update and journal entry. ## Changes - Phase 1 marked DONE (E2E quality gate, conversion funnel, analytics, release pipeline) - Bottleneck shifted to Phase 2 launch preparation - New issues filed: #1155 (pitch deck), #1156 (wallet connector fix) - Predictions triaged: #1148→#1154, #1149 dismissed, #1150 dismissed, #1141 watching, #1104 dismissed - Priority labels applied to #1154, #1155, #1156 Reviewed-on: https://codeberg.org/johba/harb/pulls/1157
This commit is contained in:
parent
e16f342c81
commit
3f0c8d5342
5 changed files with 93 additions and 55 deletions
53
planner/journal/2026-03-25.md
Normal file
53
planner/journal/2026-03-25.md
Normal file
|
|
@ -0,0 +1,53 @@
|
|||
# Planner run — 2026-03-25 09:00 UTC
|
||||
|
||||
## Predictions triaged
|
||||
- #1149: DISMISS — tree staleness resolved by this planner run
|
||||
- #1150: DISMISS — already actioned as #1151/#1152, evidence/user-test/2026-03-25.json now exists
|
||||
- #1148: PROMOTE_BACKLOG → #1154 — CROSS_BROWSER_SPECS glob over-broad, matches unintended conversion-funnel spec
|
||||
- #1141: WATCH — valid concern about adversarial testing depth, but contract safety (bug fixes) IS done; added evidence-based safety as launch day prerequisite
|
||||
- #1104: DISMISS — already closed
|
||||
|
||||
## Prerequisite tree updates
|
||||
- Resolved: E2E quality gate (#1099 — closed, merged PR #1139). Phase 1 E2E gate DONE.
|
||||
- Resolved: Mobile viewport coverage (#1099)
|
||||
- Resolved: Cross-browser matrix (#1099)
|
||||
- Resolved: Conversion funnel test exists (07-conversion-funnel.spec.ts, covers full flow with analytics)
|
||||
- Resolved: Analytics infrastructure DONE (@harb/analytics package, Umami deployed, both apps instrumented)
|
||||
- Resolved: User-test produces data (evidence/user-test/2026-03-25.json — 0/5 personas, wallet connector issue)
|
||||
- Resolved: Release pipeline DONE (CI + Docker + E2E gate integrated)
|
||||
- Discovered: Wallet connector panel not rendering at 1280x720 — blocks all 5 user-test personas
|
||||
- Discovered: Adversarial testing depth concern for launch confidence (per #1141)
|
||||
- Added: User funnel fix objective (wallet connector)
|
||||
- Added: E2E test hygiene objective (#1154 glob fix, #1153 pipeline fix)
|
||||
|
||||
## Top 3 constraints
|
||||
1. Wallet connector fix (#1156) — blocks all user funnels, critical for launch UX — filed
|
||||
2. Pitch deck (#1155) — blocks influencer outreach → launch day (3 downstream objectives) — filed
|
||||
3. Cross-browser spec glob (#1154) — blocks E2E test hygiene, prevents false CI failures — filed from #1148
|
||||
|
||||
## Stuck issues detected
|
||||
No stuck issues detected.
|
||||
|
||||
## Issues created
|
||||
- #1154: fix: CROSS_BROWSER_SPECS glob matches unintended conversion-funnel spec — from prediction #1148
|
||||
- #1155: feat: create pitch deck PDF for influencer outreach — Phase 2 bottleneck
|
||||
- #1156: fix: wallet connector panel not rendering at standard viewports — all user funnels blocked
|
||||
|
||||
## Priority label changes
|
||||
- Added priority: #1154, #1155, #1156 (top 3 constraints)
|
||||
- Removed priority: none (#1099 was the only priority issue, now closed)
|
||||
|
||||
## Observations
|
||||
- **Major milestone: Phase 1 is DONE.** E2E quality gate (#1099), conversion funnel (#1100), analytics (#1101), and release pipeline all resolved. This is the first time Phase 1 has been fully clear.
|
||||
- **Bottleneck shift: Phase 2 is now the frontier.** The constraint has moved from code quality to launch preparation (pitch deck, influencer outreach).
|
||||
- **Critical UX blocker discovered**: User-test evidence (first run ever, via #1151) reveals ALL 5 personas blocked at wallet connection. Desktop connect button not found at 1280x720. This needs urgent fix before launch.
|
||||
- **Velocity**: Contract safety cleared in runs 6-7. Phase 1 cleared in runs 7-8. Priority label system continues to drive focused work.
|
||||
- **Evidence pipeline nearly complete**: user-test now has data. Only resources/protocol formulas still dark (not on critical path).
|
||||
- **#1141 concern acknowledged**: added adversarial testing depth as a launch day prerequisite in the tree rather than reverting contract safety.
|
||||
|
||||
## Deferred (in tree, not filed)
|
||||
- Adversarial testing depth for launch — acknowledged via #1141 WATCH, prerequisite in tree, not yet actionable until closer to launch
|
||||
- Resources/protocol formula evidence — not on critical path
|
||||
- Community channel, optimizer governance — blocked on launch day scheduling
|
||||
- Influencer outreach — blocked on pitch deck
|
||||
- Woodpecker evidence-only PR pipeline (#1153) — exists, lower priority than launch blockers
|
||||
|
|
@ -1,37 +1,46 @@
|
|||
# Prerequisite Tree
|
||||
<!-- Last updated: 2026-03-23 -->
|
||||
<!-- Last updated: 2026-03-25 -->
|
||||
|
||||
## Phase 1 — Quality gate & release pipeline
|
||||
|
||||
### Objective: E2E quality gate (#1099)
|
||||
- [x] Core E2E test suite exists (tests/e2e/, 6 files)
|
||||
- [ ] Mobile viewport coverage (#1099)
|
||||
- [ ] Cross-browser matrix (#1099)
|
||||
- [x] Core E2E test suite exists (tests/e2e/, 7 files)
|
||||
- [x] Mobile viewport coverage (#1099 — closed, merged PR #1139)
|
||||
- [x] Cross-browser matrix (#1099 — closed, merged PR #1139)
|
||||
- [x] OptimizerV3 test coverage (#1054 — closed)
|
||||
- [x] Floor ratchet attack defeated (#1067, #1082 — closed)
|
||||
- [x] int256 overflow patched (#1031 — closed)
|
||||
- [x] Overflow guard for slots 1-7 (#997 — closed, merged 29b8f7d)
|
||||
Status: BLOCKED — 2 prerequisites unresolved. **CONSTRAINT** — blocks all downstream. #1099 in-progress.
|
||||
Status: DONE
|
||||
|
||||
### Objective: Conversion funnel verification (#1100)
|
||||
- [x] Landing page exists
|
||||
- [x] Staking app exists
|
||||
- [ ] E2E quality gate passing (#1099)
|
||||
- [ ] Funnel test: landing → swap → stake (#1100)
|
||||
Status: BLOCKED — depends on #1099
|
||||
- [x] E2E quality gate passing (#1099 — closed)
|
||||
- [x] Funnel test: landing → swap → stake (07-conversion-funnel.spec.ts exists, covers full flow with analytics events)
|
||||
- [ ] Cross-browser spec glob fix (#1154) — funnel spec unintentionally runs on Firefox/WebKit/mobile
|
||||
Status: DONE — funnel test exists and runs. Minor glob issue tracked in #1154.
|
||||
|
||||
### Objective: Release pipeline
|
||||
- [x] CI pipeline (Woodpecker)
|
||||
- [x] Docker images (registry.niovi.voyage)
|
||||
- [ ] E2E quality gate integrated into release (#1099)
|
||||
Status: BLOCKED — depends on #1099
|
||||
- [x] E2E quality gate integrated into release (#1099 — closed)
|
||||
Status: DONE
|
||||
|
||||
### Objective: Analytics (#1101)
|
||||
- [x] Self-hosted Umami deployed (Docker service, documented in ENVIRONMENT.md)
|
||||
- [x] Landing page instrumented (landing/src/views/HomeView.vue, landing/src/main.ts)
|
||||
- [x] Staking app instrumented (web-app/src/composables/useStake.ts, useSwapKrk.ts, useWallet.ts)
|
||||
- [x] @harb/analytics package with funnel events (packages/analytics/src/index.ts)
|
||||
- [x] E2E quality gate passing (#1099 — closed)
|
||||
Status: DONE
|
||||
|
||||
## Phase 2 — Coordinated launch
|
||||
|
||||
### Objective: Pitch deck
|
||||
- [ ] E2E quality gate passing (Phase 1 complete)
|
||||
- [ ] Analytics in place (#1101)
|
||||
Status: BLOCKED — Phase 1 incomplete
|
||||
- [x] Phase 1 complete (E2E quality gate, conversion funnel, analytics all DONE)
|
||||
- [ ] Pitch deck created (PDF explaining KRK, floor mechanics, how to buy/stake)
|
||||
Status: BLOCKED — pitch deck not yet created
|
||||
|
||||
### Objective: Influencer outreach
|
||||
- [ ] Pitch deck exists
|
||||
|
|
@ -41,18 +50,14 @@ Status: BLOCKED — prerequisite chain
|
|||
### Objective: Launch day deployment
|
||||
- [x] LiquidityManager contract
|
||||
- [x] UUPS upgradeable optimizer
|
||||
- [ ] Conversion funnel verified (#1100)
|
||||
- [x] Conversion funnel verified (07-conversion-funnel.spec.ts)
|
||||
- [ ] Pitch deck reviewed
|
||||
- [ ] Influencers committed
|
||||
- [ ] Adversarial testing depth for launch confidence (per #1141 concern: 2 red-team runs insufficient for real ETH)
|
||||
Status: BLOCKED — prerequisite chain
|
||||
|
||||
## Phase 3 — Operations
|
||||
|
||||
### Objective: Analytics (#1101)
|
||||
- [ ] Funnel tracking infrastructure (#1101)
|
||||
- [ ] E2E quality gate passing (#1099)
|
||||
Status: BLOCKED — depends on #1099
|
||||
|
||||
### Objective: Community channel
|
||||
- [ ] Launch day scheduled
|
||||
Status: BLOCKED — prerequisite chain
|
||||
|
|
@ -79,6 +84,16 @@ Status: DONE
|
|||
- [x] Evolution commits via PR (#1047 — closed)
|
||||
- [x] Evolution pipeline produces output (evidence/evolution/best.push3 exists)
|
||||
- [x] Holdout produces data (evidence/holdout/2026-03-22-issue517-adversarial-lp.json)
|
||||
- [x] User-test produces data (evidence/user-test/2026-03-25.json — 0/5 personas completed, wallet connector blocking)
|
||||
- [ ] Resources/protocol formulas produce data (formulas exist, evidence dirs empty)
|
||||
- [ ] User-test produces data (evidence/user-test/ empty)
|
||||
Status: BLOCKED — 1 prerequisite unresolved
|
||||
|
||||
### Objective: User funnel fix
|
||||
- [ ] Wallet connector renders at 1280x720 viewport (all 5 user-test personas blocked here)
|
||||
- [ ] Desktop connect button visible at standard viewports
|
||||
Status: BLOCKED — discovered via user-test evidence 2026-03-25. Blocks all user funnels.
|
||||
|
||||
### Objective: E2E test hygiene
|
||||
- [ ] Cross-browser spec glob fix (#1154 — CROSS_BROWSER_SPECS matches unintended conversion-funnel spec)
|
||||
- [ ] Woodpecker evidence-only PR pipeline (#1153)
|
||||
Status: BLOCKED — 2 prerequisites unresolved
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue