chore: planner run journal 2026-03-20 (#1064)
Planner journal entry from first cron-driven run. Moved from disinto PR #390 — planner journals belong in the harb repo. Reviewed-on: https://codeberg.org/johba/harb/pulls/1064 Reviewed-by: Disinto_bot <disinto_bot@noreply.codeberg.org>
This commit is contained in:
parent
8583ec9119
commit
810f47cdd6
2 changed files with 63 additions and 0 deletions
33
planner/MEMORY.md
Normal file
33
planner/MEMORY.md
Normal file
|
|
@ -0,0 +1,33 @@
|
|||
# Planner Memory
|
||||
|
||||
## 2026-03-20 — First planner run
|
||||
|
||||
### Milestone state
|
||||
- **Foundation**: COMPLETE. Agent loop, supervisor, planner, multi-project all working.
|
||||
- **Adoption**: NOT STARTED. No bootstrap command, no docs, landing page exists but lacks content.
|
||||
- **Scale**: PARTIALLY started (multi-project works for 3 repos).
|
||||
|
||||
### Evidence pipeline state
|
||||
- 6 evidence dimensions defined (red-team, evolution, holdout, user-test, resources, protocol)
|
||||
- 4 have formulas in harb (red-team, evolution, holdout, user-test) — all recently fixed
|
||||
- 2 have NO formulas at all (resources, protocol) — filed #1059
|
||||
- 0/6 dimensions have any data on disk
|
||||
- #1047 blocks evolution specifically (results not committed via PR)
|
||||
- Red-team is independent and was dispatched as action #1058
|
||||
|
||||
### Patterns
|
||||
- Predictor (goblin) over-signals on evidence gaps — all 5 predictions were about missing evidence data. Expected to normalize once pipelines produce their first runs.
|
||||
- High blocked:backlog ratio across projects suggests deep dependency chains. Gardener should be monitoring for circular deps.
|
||||
- The factory is self-hosting successfully — all agents run, CI passes, PRs merge. The gap is external visibility, not internal capability.
|
||||
|
||||
### Strategic direction
|
||||
- Adoption is the leverage multiplier: everything in Scale depends on having users first.
|
||||
- Created #1060 (disinto init), #1061 (docs), #1062 (metrics dashboard) as the Adoption on-ramp.
|
||||
- #1061 depends on #1060 — quickstart needs the bootstrap flow to reference.
|
||||
- #1062 (metrics dashboard) is the social proof play — show the factory working rather than just claiming it.
|
||||
|
||||
### Watch list
|
||||
- #1020 + #1047: evolution pipeline needs commit-via-PR fix before runs produce persistent evidence
|
||||
- #1022: holdout/user-test blocked on evolution data existing
|
||||
- #341: stale issue (extraction already done) — gardener should close or update
|
||||
- Disk at 79% — evidence formulas will add data; monitor trajectory
|
||||
Loading…
Add table
Add a link
Reference in a new issue