Commit graph

8 commits

Author SHA1 Message Date
johba
3176dddebd chore: planner run 2026-03-27
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-27 08:08:55 +00:00
johba
a2bbc2adb5 chore: planner run 2026-03-26
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-26 08:06:22 +00:00
johba
3f0c8d5342 chore: planner run — Phase 1 complete, bottleneck shifts to Phase 2 (#1157)
Automated planner run — prerequisite tree update and journal entry.

## Changes
- Phase 1 marked DONE (E2E quality gate, conversion funnel, analytics, release pipeline)
- Bottleneck shifted to Phase 2 launch preparation
- New issues filed: #1155 (pitch deck), #1156 (wallet connector fix)
- Predictions triaged: #1148→#1154, #1149 dismissed, #1150 dismissed, #1141 watching, #1104 dismissed
- Priority labels applied to #1154, #1155, #1156

Reviewed-on: https://codeberg.org/johba/harb/pulls/1157
2026-03-25 09:36:59 +01:00
johba
756426aa88 chore: planner run 2026-03-23 2026-03-23 12:54:01 +00:00
johba
cbc41ad57c chore: planner run 2026-03-22
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-22 13:18:41 +00:00
johba
bcfb81eab5 chore: planner run 2026-03-22
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-22 11:04:35 +00:00
johba
02ca80fd5a chore: planner run 2026-03-22 2026-03-22 10:44:42 +00:00
johba
c238bd1f57 chore: seed prerequisite tree + RESOURCES.md
Prerequisite tree seeded from VISION.md milestones with current issue state.
Top 3 constraints: contract safety (#1031/#997/#1067), OptimizerV3 tests (#1054),
evolution commits via PR (#1047).

RESOURCES.md lists evolution box, Codeberg accounts, CI, and RPC access.

Part of disinto #502 (planner v2).
2026-03-22 09:09:58 +01:00