chore: planner run 2026-03-22
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
parent
29b8f7d426
commit
cbc41ad57c
2 changed files with 40 additions and 4 deletions
|
|
@ -10,8 +10,8 @@
|
|||
- [ ] OptimizerV3 test coverage (#1054)
|
||||
- [ ] Floor ratchet attack defeated (#1067, #1082)
|
||||
- [ ] int256 overflow patched (#1031)
|
||||
- [ ] Overflow guard for slots 1-7 (#997)
|
||||
Status: BLOCKED — 6 prerequisites unresolved
|
||||
- [x] Overflow guard for slots 1-7 (#997 — closed, merged 29b8f7d)
|
||||
Status: BLOCKED — 5 prerequisites unresolved
|
||||
|
||||
### Objective: Conversion funnel verification (#1100)
|
||||
- [x] Landing page exists
|
||||
|
|
@ -67,10 +67,10 @@ Status: BLOCKED — prerequisite chain
|
|||
### Objective: Contract safety
|
||||
- [ ] Floor ratchet attack defeated (#1067, #1082)
|
||||
- [ ] int256 overflow patched (#1031)
|
||||
- [ ] Overflow guard for slots 1-7 (#997)
|
||||
- [x] Overflow guard for slots 1-7 (#997 — closed, merged 29b8f7d)
|
||||
- [ ] Catch block clamping fix (#1019)
|
||||
- [ ] OptimizerV3 tested (#1054)
|
||||
Status: BLOCKED — 5 prerequisites unresolved. **CONSTRAINT** — blocks Phase 1.
|
||||
Status: BLOCKED — 4 prerequisites unresolved. **CONSTRAINT** — blocks Phase 1.
|
||||
|
||||
### Objective: Evidence pipeline
|
||||
- [x] Red-team formula exists
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue