diff --git a/planner/MEMORY.md b/planner/MEMORY.md index 65f065d..74e1d15 100644 --- a/planner/MEMORY.md +++ b/planner/MEMORY.md @@ -1,34 +1,32 @@ + # Planner Memory -## 2026-03-20 — First planner run +## 2026-03-22 — Run 5 summary -### Milestone state - -- **Foundation**: COMPLETE. Agent loop, supervisor, planner, multi-project all working. -- **Adoption**: IN PROGRESS. Issues #1060 (disinto init), #1061 (docs/quickstart), #1062 (metrics dashboard) created as on-ramp; work not yet merged. -- **Scale**: PARTIALLY started (multi-project works for 3 repos). +### Bottleneck: Contract safety (unchanged since tree creation) +Contract safety is the singular bottleneck blocking all of Phase 1, Phase 2, and Phase 3. Four prerequisites remain: +- **#1031** — int256 overflow in ThreePositionStrategy._computeFloorTickWithSignal +- **#1019** — catch block skips clamping that try block applies +- **#1067** — floor ratchet attack not yet defeated (red-team data from #1085 run exists but fix not implemented) +- **#1054** — OptimizerV3 has no dedicated test file -### Evidence pipeline state -- 6 evidence dimensions defined (red-team, evolution, holdout, user-test, resources, protocol) -- 4 have formulas in harb (red-team, evolution, holdout, user-test) — all recently fixed -- 2 have NO formulas at all (resources, protocol) — filed #1059 -- 0/6 dimensions have any data on disk -- #1047 blocks evolution specifically (results not committed via PR) -- Red-team is independent and was dispatched as action #1058 +Only #997 (overflow guard slots 1-7) resolved across 5 runs — merged 2026-03-22. Priority labels added to #1031, #1019, #1067 to signal dev agent urgency. + +### Evidence pipeline +- Red-team: has baseline data (evidence/red-team/2026-03-20.json) +- Evolution: best.push3 exists on disk but NOT committed to master — local-only +- Resources, protocol, holdout, user-test: all empty on master +- All 6 formulas exist on disk. Evidence gaps are not on the critical path — contract safety must clear first. ### Patterns -- Predictor (goblin) over-signals on evidence gaps — all 5 predictions were about missing evidence data. Expected to normalize once pipelines produce their first runs. -- High blocked:backlog ratio across projects suggests deep dependency chains. Gardener should be monitoring for circular deps. -- The factory is self-hosting successfully — all agents run, CI passes, PRs merge. The gap is external visibility, not internal capability. +- Predictor over-signals on infrastructure/dark-factory noise — most predictions dismissed as not harb-specific +- Contract safety work velocity: 1 prereq resolved per day when dev agent engages. At this rate, remaining 4 items could clear in ~4 days. +- Evolution pipeline produces output but doesn't persist to git — evolution commit-via-PR (#1047) was fixed but evidence still not appearing on master +- Three stale unlabeled issues (#517, #383, #147) noted by prediction #1105 — gardener has not triaged them across multiple runs -### Strategic direction -- Adoption is the leverage multiplier: everything in Scale depends on having users first. -- Created #1060 (disinto init), #1061 (docs), #1062 (metrics dashboard) as the Adoption on-ramp. -- #1061 depends on #1060 — quickstart needs the bootstrap flow to reference. -- #1062 (metrics dashboard) is the social proof play — show the factory working rather than just claiming it. - -### Watch list -- #1020 + #1047: evolution pipeline needs commit-via-PR fix before runs produce persistent evidence -- #1022: holdout/user-test blocked on evolution data existing -- #341: stale issue (extraction already done) — gardener should close or update -- Disk at 79% — evidence formulas will add data; monitor trajectory +### Strategic context +- Phase 1 (quality gate) is entirely blocked on contract safety +- Phase 2 (launch) is blocked on Phase 1 +- Phase 3 (operations) is blocked on Phase 1 +- The prerequisite tree is stable — no new objectives or prerequisites discovered in runs 2-5 +- Priority label system introduced in run 5 to direct dev agent attention to bottleneck issues diff --git a/planner/journal/2026-03-22.md b/planner/journal/2026-03-22.md index 3474d6d..21e319e 100644 --- a/planner/journal/2026-03-22.md +++ b/planner/journal/2026-03-22.md @@ -102,3 +102,40 @@ No new issues — all top constraints already have open backlog issues. - Conversion funnel (#1100), Analytics (#1101) — blocked on E2E gate - Resources/protocol formula dispatch — idle compute, not on critical path - Pitch deck, influencer outreach — blocked on Phase 1 completion + +--- + +# Planner run — 2026-03-22 23:45 UTC + +## Predictions triaged +No unreviewed predictions. + +## Prerequisite tree updates +No tree changes — same 4 contract safety prerequisites remain unresolved (#1031, #1019, #1067, #1054). + +## Top 3 constraints +1. int256 overflow (#1031) — blocks 10 objectives via Contract safety → Phase 1 chain — issue already open +2. Catch block clamping fix (#1019) — blocks 10 objectives — issue already open +3. Floor ratchet attack defeated (#1067) — blocks 10 objectives — issue already open + +## Issues created +No new issues — all top constraints already have open backlog issues. + +## Priority label changes +- Added priority: #1031, #1019, #1067 (top 3 constraints) +- Created `priority` label (did not exist before this run) + +## Observations +- Contract safety remains the singular bottleneck for the 4th consecutive run. Priority labels now applied to top 3 constraint issues to signal dev agent pickup urgency. +- #997 was the only contract safety prereq resolved across all 4 runs today. Remaining 4 items (#1031, #1019, #1067, #1054) have had no commit activity. +- Evolution best.push3 exists on disk (/home/debian/harb/evidence/evolution/) but is NOT committed to master — the file is local-only. Pipeline produces output but doesn't persist it to the repo. +- Evidence state unchanged: red-team has data, everything else empty on master. +- Vault directories still don't exist — no procurement needed at current stage. +- Memory update triggered (run 5) — distilling patterns from 5 runs into MEMORY.md. + +## Deferred (in tree, not filed) +- OptimizerV3 tests (#1054) — 4th constraint, not filed separately +- Mobile viewport + cross-browser E2E (#1099) — blocked on contract safety +- Conversion funnel (#1100), Analytics (#1101) — blocked on E2E gate +- Resources/protocol formula dispatch — idle compute, not on critical path +- Pitch deck, influencer outreach — blocked on Phase 1 completion