chore: planner run — Phase 1 complete, bottleneck shifts to Phase 2 (#1157)
Automated planner run — prerequisite tree update and journal entry. ## Changes - Phase 1 marked DONE (E2E quality gate, conversion funnel, analytics, release pipeline) - Bottleneck shifted to Phase 2 launch preparation - New issues filed: #1155 (pitch deck), #1156 (wallet connector fix) - Predictions triaged: #1148→#1154, #1149 dismissed, #1150 dismissed, #1141 watching, #1104 dismissed - Priority labels applied to #1154, #1155, #1156 Reviewed-on: https://codeberg.org/johba/harb/pulls/1157
This commit is contained in:
parent
e16f342c81
commit
3f0c8d5342
5 changed files with 93 additions and 55 deletions
53
planner/journal/2026-03-25.md
Normal file
53
planner/journal/2026-03-25.md
Normal file
|
|
@ -0,0 +1,53 @@
|
|||
# Planner run — 2026-03-25 09:00 UTC
|
||||
|
||||
## Predictions triaged
|
||||
- #1149: DISMISS — tree staleness resolved by this planner run
|
||||
- #1150: DISMISS — already actioned as #1151/#1152, evidence/user-test/2026-03-25.json now exists
|
||||
- #1148: PROMOTE_BACKLOG → #1154 — CROSS_BROWSER_SPECS glob over-broad, matches unintended conversion-funnel spec
|
||||
- #1141: WATCH — valid concern about adversarial testing depth, but contract safety (bug fixes) IS done; added evidence-based safety as launch day prerequisite
|
||||
- #1104: DISMISS — already closed
|
||||
|
||||
## Prerequisite tree updates
|
||||
- Resolved: E2E quality gate (#1099 — closed, merged PR #1139). Phase 1 E2E gate DONE.
|
||||
- Resolved: Mobile viewport coverage (#1099)
|
||||
- Resolved: Cross-browser matrix (#1099)
|
||||
- Resolved: Conversion funnel test exists (07-conversion-funnel.spec.ts, covers full flow with analytics)
|
||||
- Resolved: Analytics infrastructure DONE (@harb/analytics package, Umami deployed, both apps instrumented)
|
||||
- Resolved: User-test produces data (evidence/user-test/2026-03-25.json — 0/5 personas, wallet connector issue)
|
||||
- Resolved: Release pipeline DONE (CI + Docker + E2E gate integrated)
|
||||
- Discovered: Wallet connector panel not rendering at 1280x720 — blocks all 5 user-test personas
|
||||
- Discovered: Adversarial testing depth concern for launch confidence (per #1141)
|
||||
- Added: User funnel fix objective (wallet connector)
|
||||
- Added: E2E test hygiene objective (#1154 glob fix, #1153 pipeline fix)
|
||||
|
||||
## Top 3 constraints
|
||||
1. Wallet connector fix (#1156) — blocks all user funnels, critical for launch UX — filed
|
||||
2. Pitch deck (#1155) — blocks influencer outreach → launch day (3 downstream objectives) — filed
|
||||
3. Cross-browser spec glob (#1154) — blocks E2E test hygiene, prevents false CI failures — filed from #1148
|
||||
|
||||
## Stuck issues detected
|
||||
No stuck issues detected.
|
||||
|
||||
## Issues created
|
||||
- #1154: fix: CROSS_BROWSER_SPECS glob matches unintended conversion-funnel spec — from prediction #1148
|
||||
- #1155: feat: create pitch deck PDF for influencer outreach — Phase 2 bottleneck
|
||||
- #1156: fix: wallet connector panel not rendering at standard viewports — all user funnels blocked
|
||||
|
||||
## Priority label changes
|
||||
- Added priority: #1154, #1155, #1156 (top 3 constraints)
|
||||
- Removed priority: none (#1099 was the only priority issue, now closed)
|
||||
|
||||
## Observations
|
||||
- **Major milestone: Phase 1 is DONE.** E2E quality gate (#1099), conversion funnel (#1100), analytics (#1101), and release pipeline all resolved. This is the first time Phase 1 has been fully clear.
|
||||
- **Bottleneck shift: Phase 2 is now the frontier.** The constraint has moved from code quality to launch preparation (pitch deck, influencer outreach).
|
||||
- **Critical UX blocker discovered**: User-test evidence (first run ever, via #1151) reveals ALL 5 personas blocked at wallet connection. Desktop connect button not found at 1280x720. This needs urgent fix before launch.
|
||||
- **Velocity**: Contract safety cleared in runs 6-7. Phase 1 cleared in runs 7-8. Priority label system continues to drive focused work.
|
||||
- **Evidence pipeline nearly complete**: user-test now has data. Only resources/protocol formulas still dark (not on critical path).
|
||||
- **#1141 concern acknowledged**: added adversarial testing depth as a launch day prerequisite in the tree rather than reverting contract safety.
|
||||
|
||||
## Deferred (in tree, not filed)
|
||||
- Adversarial testing depth for launch — acknowledged via #1141 WATCH, prerequisite in tree, not yet actionable until closer to launch
|
||||
- Resources/protocol formula evidence — not on critical path
|
||||
- Community channel, optimizer governance — blocked on launch day scheduling
|
||||
- Influencer outreach — blocked on pitch deck
|
||||
- Woodpecker evidence-only PR pipeline (#1153) — exists, lower priority than launch blockers
|
||||