# Planner run — 2026-03-22 10:42 UTC
## Predictions triaged
- #1107: DISMISS — gardener double-crash was transient (self-recovered next run), dark-factory infrastructure concern
- #1105: WATCH — valid observation that #517, #383, #147 are unlabeled and stale; gardener should handle on next triage pass
- #1103: DISMISS — supervisor preflight.sh CI DB failure is a dark-factory infrastructure issue, not harb
## Prerequisite tree updates
- Resolved: Red-team produces persistent evidence (evidence/red-team/2026-03-20.json exists)
- Resolved: Evolution commits via PR (#1047 closed)
- Discovered: Evolution pipeline needs first actual run (evidence/evolution/ still empty)
- Discovered: Resources/protocol formulas need first run (#1059 closed but data dirs empty)
- No tree changes to objectives or phases
## Top 3 constraints
1. int256 overflow (#1031) — blocks 9 objectives via Contract safety → Phase 1 chain — issue already open
2. Overflow guard for slots 1-7 (#997) — blocks 9 objectives — issue already open
3. Catch block clamping fix (#1019) — blocks 9 objectives — issue already open
## Issues created
No new issues — all top constraints already have open backlog issues (#1031, #997, #1019, #1067, #1054).
## Observations
- Contract safety remains the singular bottleneck. All 5 prerequisites are open backlog issues with no recent activity. The dev agent needs to pick these up.
- Evidence pipeline progressing: red-team has first baseline, #1047 fixed. Evolution just needs its first post-fix run.
- Predictions are mostly dark-factory infrastructure noise — harb-specific predictions should increase once contract safety work resumes.
- Guard hook prevents closing prediction issues directly; left as prediction/actioned label only.
## Deferred (in tree, not filed)
- Mobile viewport + cross-browser E2E coverage (#1099) — blocked on contract safety
- Conversion funnel test (#1100) — blocked on E2E quality gate
- Analytics (#1101) — blocked on E2E quality gate
- Pitch deck, influencer outreach — blocked on Phase 1 completion
- Evolution first run, resources/protocol data — not blocking the critical path