48 lines
3.6 KiB
Markdown
48 lines
3.6 KiB
Markdown
|
|
# Planner run — 2026-03-26 08:30 UTC
|
||
|
|
|
||
|
|
## Predictions triaged
|
||
|
|
- #1158: DISMISS — Phase 1 correctly DONE per VISION.md criteria. Domain is Phase 2 concern (added to tree). #1153 fixed.
|
||
|
|
- #1164: DISMISS — already actioned as #1165. User-test ran 2026-03-26 confirming wallet fix (5/5 connect). New bug #1168 discovered.
|
||
|
|
- #1166: WATCH — valid evolution evidence concern (best.push3 untracked, no fitness JSON). Tree updated to revert prereq. Not critical path.
|
||
|
|
|
||
|
|
## Prerequisite tree updates
|
||
|
|
- Resolved: Wallet connector renders at 1280x720 (#1156 — closed, verified by user-test 2026-03-26: 5/5 personas connect)
|
||
|
|
- Resolved: Desktop connect button visible (#1156 — closed)
|
||
|
|
- Resolved: Cross-browser spec glob fix (#1154 — closed)
|
||
|
|
- Resolved: Woodpecker evidence-only PR pipeline (#1153 — closed)
|
||
|
|
- Resolved: E2E test hygiene objective → DONE (both prereqs cleared)
|
||
|
|
- Reverted: Evolution pipeline "produces output" → unresolved (best.push3 untracked, no fitness JSON, per #1166)
|
||
|
|
- Discovered: attemptStake helper produces /stakestake invalid route (#1168) — blocks staking verification for all personas
|
||
|
|
- Discovered: Brand identity undefined — human comment on #1155 says "No brand identity/domain yet"
|
||
|
|
- Added: Domain registration as Phase 2 objective (prerequisite for launch day)
|
||
|
|
- Updated: Pitch deck now blocked on brand identity (human decision), not just creation
|
||
|
|
|
||
|
|
## Top 3 constraints
|
||
|
|
1. Brand identity (human decision) — blocks pitch deck → influencer outreach → launch day → community → optimizer governance (5 downstream objectives) — no issue, awaiting human
|
||
|
|
2. #1168 (attemptStake URL fix) — blocks user funnel verification, impacts user-test evidence quality — priority added
|
||
|
|
3. Adversarial testing depth — blocks launch day confidence — #1169 filed (action: run-red-team)
|
||
|
|
|
||
|
|
## Stuck issues detected
|
||
|
|
No stuck issues detected.
|
||
|
|
|
||
|
|
## Issues created
|
||
|
|
- #1169: action: run red-team formula — adversarial testing depth for launch confidence
|
||
|
|
|
||
|
|
## Priority label changes
|
||
|
|
- Added priority: #1168 (stakestake URL fix — top constraint), #1155 (pitch deck — signal to human)
|
||
|
|
- Removed priority: none (previous priority issues #1154, #1156 now closed)
|
||
|
|
|
||
|
|
## Observations
|
||
|
|
- **Phase 2 bottleneck is human-gated.** Brand identity (name, domain, visual identity) is the root constraint blocking pitch deck, domain registration, and all downstream launch objectives. No amount of dev work unblocks this — it requires a human decision.
|
||
|
|
- **User funnel validated, then broken again.** The wallet connector fix (#1156) works — user-test 2026-03-26 shows 5/5 personas connect. But a new bug in the test helper (#1168, `/stakestake` URL) blocks staking verification. The fix is trivial (use `origin + /stake` instead of string concatenation).
|
||
|
|
- **E2E test hygiene objective cleared.** Both #1153 and #1154 closed since last run. This objective is now DONE.
|
||
|
|
- **Evidence pipeline improving.** User-test has a second data point (2026-03-26, on PR #1167). Evolution evidence reverted to unresolved per #1166 — valid concern about untracked/stale best.push3.
|
||
|
|
- **Adversarial testing depth now tracked.** Dispatched #1169 to run another red-team pass. Currently 2 evidence files; need at least 3 for launch confidence.
|
||
|
|
|
||
|
|
## Deferred (in tree, not filed)
|
||
|
|
- Domain registration — blocked on brand identity (human decision), no vault request until brand is decided
|
||
|
|
- Evolution fitness evidence — not on critical path for launch
|
||
|
|
- Resources/protocol formula evidence — not on critical path
|
||
|
|
- Community channel, optimizer governance — blocked on launch day scheduling
|
||
|
|
- Influencer outreach — blocked on pitch deck → brand identity
|